Search This Blog

Showing posts with label radio. Show all posts
Showing posts with label radio. Show all posts

Monday, April 25, 2011

Metal Shop Fummins Truck Giveaway Night


Friday night the Metal Shop Build concluded (for the most-part) at a party thrown by KBPI Radio at Quaker Steak. A big crowd of key winners and others who just wanted to get in on the action headed to Westminster CO. to check out the truck in the parking lot before one person would finally have their key start the engine and take possession of their prize.

Coyote Motorsports Arrives With
The Raptor 700 Prize
By 7pm the parking lot was overflowing as KBPI awarded the final set of ignition keys. Coyote Motorsports rolled in with a new Raptor 700 quad to add to the prize package. Each key was placed inside it's own tiny envelope and hung on a pegboard in front of the fummins truck. One-by-one the key recipients stepped up to the truck to try their luck. One or more of the contestants, as noted by the night's host - Willie B., had traveled from a few states away to try to win the truck.

Some time later and with some frozen Bud Light Girls desperately looking-on Dominic H. and his wife Adrianna finally handed Willie the winning key. Everyone knew that a winner had finally stepped forward; Not by the sound of engine starting, but rather by the screaming coming out of Adrianna.
As the deadline arrived for the giveaway night there were still some loose ends with the build that ATS, Master Craft, and Car Toys will be working on now in order to hand over truck to Dominic. Thanks to everyone that took part in this year's Metal Shop and congratulations to Dominic and Adrianna!

<<< Check out the flash player below for the rest of the photos. If your flash player is not up-to-date visit http://www.flash.com >>>

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player


Friday, April 22, 2011

Metal Shop Fummins Final Hours

The final trim pieces are painted and coming together on the truck. Yesterday the guys were finishing with some work to the brakes and finishing fabrication with the suspension system. The truck is looking pretty complete with all of the body pieces being added where they belong.

Front Grill is ready complements of Camaros Plus

 A couple of finishing details will have to be added after the giveaway tonight due to the hours involved in building the main parts of truck. After ATS the Fummins will go to Car Toys for the sound system and then onto Master Craft Auto for the interior and upholstery work.
The person who finds out that they have the winning key to the truck tonight at Quaker Steak and Lube will definitely be taking possession of a one-of-a-kind vehicle. There will be a lot of potential to modify the truck for more performance in the future and we're hoping that the truck will show back up for more upgrades and updates.






Thursday, April 21, 2011

Metal Shop Fummins Truck Glass, Electrical, And Wheels

Bill's Englewood Driveshaft Helps Out On The Driveline
High Class Auto
Glass Installs
The Windows
As the guys were working on getting the driveline in-place thanks to Bill's Englewood Driveshaft, the boys from High Class Autoglass stopped by to get new glass put in the Fummins Metal Shop Truck. The windows were tinted which matches the black paint scheme nicely.

While this was happening the guys from ATS had the intercooler propped-up in front of the engine while the charge air pipes were fabricated and fitted. On the back of the truck the custom dual battery tray was mounted for the Optima's, which will help keep the engine compartment clean and more open.

Zach and Nelson got more work done to the engine compartment and have been running electrical and fitting pieces for the engine and the dash. The custom dash will have updated gauges from Autometer and should give the truck's interior a great look.

Wheels From Jazz It Up
New wheels and tires arrived from Jazz It Up to match the black body pieces and are being fitted on the front and rear. The bumpers and body trim pieces are being coated in the same black as the main body and will be bolted on once the major work is done to the other areas.

Zach had some modification to do on the back of truck and spent last night welding the supports for the 4-Link Suspension System.



Red Top Optima's In Custom Bracket
Intercooler Is Prepped For Install
Sizing-Up The Door
Engine Work & Cab Fitment
High Class Preps New Windshield
Zach Fabricates Intercooler Pipes
Where am I?
Nelson Works On Electrical
You Can't
Doug and Zach Fabricate
The Custom Dash
Mike Brings In The New
Wheel Set
Camaros Plus Preps
The Trim Pieces
Chris Modifies The Front
Suspension For New Wheels
Zach Welds Part Of The
4-Link Suspension





Monday, April 11, 2011

KBPI Radio's Metal Shop 7 Truck Rear End

The Fummins Metal Shop Truck now sits on a 14-bolt 11.5" rear end with a custom fabricated 4-Link suspension. The front end has also been updated with heavy-duty springs and rotors from Jazz It Up. Fuel will held in the fuel cell which is now bolted in-place. Due to the torque that the rear end will see from the Cummins Engine and the low-sitting attitude of chassis, the 4-Link System made sense to put on the back. This will do a good job of keeping the wheels planted and update the old style suspension with new technology. Rear airbags will be added by ATS to help finish the overall package.


Front End Work For The Metal Shop Fummins

Zach, Mike & Devin Mount The
Front-end Parts
With the engine transplanted into the truck, work was able to begin on the front-end assembly of the Fummins. Zach, Mike, and Devin began mocking-up the front radiator and supports. The hood will be placed on the truck and will allow for measurements and fitting to happen between all of the pieces. Once the front pieces are mounted then the detail work inside the engine compartment can be completed.

Next; Onto the 4-Link Suspension and rear end work!









Monday, February 14, 2011

KBPI Radio's Metal Shop 7 - Studio Setup

KBPI Radio's Scoop made the trip to ATS Diesel's HQ today to get the streaming video/photo cameras set up. A handful of cameras were mounted around the build area and up-linked to KBPI's website server to allow the build to be followed online.
The build area studio is setting up.

Scoop gets the video streaming online

Joel sets up the network to stream live shots
According to the KBPI polling it looks like the engine going into the Metal Shop Truck will be a 12-Valve Cummins. Up for voting today on the KBPI website is the paint color and door handle style. Also up for decision is the option to either have the truck in long bed or short bed flavor. More updates coming soon!

Tuesday, February 8, 2011

KBPI Radio's Metal Shop 7 Truck Build At ATS Diesel

KBPI DJ Willie B. Shows Off The Truck To Be Built


For the 7th edition of KBPI Radio's Metal Shop Vehicle Build, ATS Diesel was chosen to be the 2011 host. Each year the radio station locates a donor vehicle and product sponsors. The vehicle is then rebuilt and modified with performance upgrades. This year's vehicle is a 1977 F-150 Pickup which will receive a diesel engine transplant along with a grocery list of other upgrades which will all be voted-on by the listeners.
Cold Start For The F-150
The Build Area Is Prepped


This week as the build process begins the '77 Ford was dropped-off at ATS Diesel. The crew at the shop began clearing and prepping the area where the build will take place. This week KBPI has a page on their website devoted to allowing listeners to vote on which power plant will be installed into the truck in place of the 460 gas engine. The engine options are the 5.9L Cummins from the Dodge Ram, 6.6L Duramax from GM Diesels, and the 7.3L Ford Power Stroke.


Whichever engine is decided-on, the truck is going to need some serious help on the front end to support the additional weight versus the 460 gas unit. Body work and interior upgrades will also be happening along the way and this truck should look a lot different very soon.